| Category | Winner | Unit | Team Name | QC Case Study Details |
|---|---|---|---|---|
| Large Category | Platinum | SSD Noida | Surya | Reduction of Inprocess Rejection Assembly Lines |
| Gold | MVACL Vietnam | Skyline | To eliminate moving contact slanting issue at pressing process | |
| Silver | SSD Pantnagar | Himalaya | To Reduce Setup & Adjustment Loss Time in the Wiring Harness | |
| Small Category | Jury Mention | WHD Grt. Noida | Udaan | To reduce Customer Warranty PPM by 50% |
| Gold | WHD Pithampur | Udaan | To eliminate continuity disruption in maxi fuse circuit harness | |
| Silver | RN Tech | Yoddha | Productivity Improvement of LB Assembly Line |
| Category | Winner | Unit | Team Name | Kaizen Case Study Details |
|---|---|---|---|---|
| Large Category | Platinum | MCL SSD PN | Innovators | Manpower Reduction through packing process automation |
| Gold | MVACL Vietnam | Winner | To enhance the wire insertion capacity in grommet assembly process | |
| Silver | MCL CD Grt. Noida | Manthan | To Improve productivity of VDA Line by reduction in the Breakdown & rejection | |
| Jury Mention | MCL DCD Grt. Noida | Spark | Cost Reduction through process Improvement & Cutting Blade Life Optimisation | |
| Small Category | Gold | Minda Silca, Grt. Noida | Saksham | Productivity Improvement of Wave parts through conversion of Manual part removing |
| Silver | Riddhi Auto | Urjawan | To reduce energy consumption through technology upgradation |
| Category | Winner | Unit | Team Name | QC Case Study Details |
|---|---|---|---|---|
| Quality Circle | Platinum | WHD-Pune-1 | Team Ashtapradhan | Quality Improvement in M&M assy. line by eliminating major internal defects |
| Gold | WHD-Pune-2 | Team Saksham | Terminal Backout in Yellow Relay Base Connector | |
| Silver | IPD Gujrat | Team Sparkians | To Eliminate Duct Coming Out From Structure Lock in Set Floor Console & Duct RR | |
| Silver | MIL Pune | Team Fighter | E101 High Trip not working |
| Category | Winner | Unit | Team Name | Kaizen Case Study Details |
|---|---|---|---|---|
| Kaizen | Platinum | WHD-Pune-1 | Aatmnirbhar | Process improvement in Single crimping machine |
| Gold | DCD-U2 | Team Navinya | Enhancements in Milling Operation of Boach TMC through Special Purpose Machine (SPM)) | |
| Silver | MIL Chennai | Team Risers | Reduce In-process rejection- Speedo Reading NG |